[. . . ] Canon model VB-S900F A&E Specifications SECTION 28 23 00 VIDEO SURVEILLANCE SYSTEM DISCLAIMER FOR VIDEO SURVEILLANCE SPECIFICATIONS The following is a recommended form of disclaimer with respect to the illustrative specifications for the Video System Surveillance System using the Canon NVS camera systems. The disclaimer presumes that the technical details in each of the illustrations, as set forth under Section 2. 02 System Specifications, have been reviewed and confirmed by Canon as meeting the technical specifications for each of the relative product models as of the date hereof. Further, it is recommended that the examples to be delivered include an embedded “watermark” or other reference on each page indicating that they are “For Illustration Only”. DISCLAIMER: These “Section 28 23 00 Video Surveillance System” specifications (the “Form Specifications”) are general in nature and solely for illustration. [. . . ] OWNER does not warrant the condition of any portion of the existing wiring, conduit or raceway systems. Prior to submitting his proposal, Contractor shall examine all existing conditions and determine to what extent the existing wiring, conduit, and raceway systems may be reused. OWNER / November 22, 2013 28 23 00 - 7 Video Surveillance System Canon model VB-S900F A&E Specifications 1. Contractor’s proposal price shall include the cost of replacing existing wiring, conduit, and raceways as required. 1. 09 SEQUENCING A. Description This implementation plan describes the general approach that shall be followed in order to minimize the time for the access control systems to be operational. Approach Contractor shall plan and schedule all work in such a sequence as to minimize the time before the system is operational. Order all equipment needed and notify any subcontractors to schedule their participation. Insure there are an adequate number of power receptacles available to operate all security equipment and coordinate with OWNER as to where power is available. Provide shop drawings to verify location of all equipment, conduit runs, power connections, etc. Coordinate with OWNER to provide space for the placement of all monitoring, control and recording equipment. 1. 10 SCHEDULING The Contractor, within five (5) days after being awarded the contract, shall prepare and submit for OWNER’s information, an estimated progress schedule for the Work. The progress schedule shall be related to the entire project, and shall indicate start and completion dates. Contractor warrants that all Work furnished (material and labor) under this Contract will be of good quality, free from faults and defects, and in conformance with the Project Drawings and Specifications. Unless otherwise specified herein, Contractor’s guarantee shall be for a period of one (1) year from date of Acceptance, except where any specific guarantees from a supplier or equipment manufacturer extends for a longer time. Contractor’s guarantee shall cover all costs associated with troubleshooting, repair, and replacement of defective Work, including costs of labor, transportation, lodging, materials, and equipment. Guarantee shall not cover any damage to material or equipment caused by accident, misuse, unauthorized modification or repair by OWNER, or acts of god. 28 23 00 - 8 Video Surveillance System B. C. D. OWNER / November 22, 2013 Canon model VB-S900F A&E Specifications E. Contractor shall promptly respond to OWNER’s requests for service during the guarantee period. Contractor shall provide repair service as soon as reasonably possible upon request from OWNER, but in no case shall service response exceed 8 hours from time of request. 1. 12 SYSTEM STARTUP Power shall only be applied to the system after re-checking for proper grounding of the system and measuring all loops for lack of shorts, grounds, and open circuits. Contractor shall closely schedule and coordinate his activities with designated OWNER representatives. Contractor shall provide OWNER’s Project Manager with a work plan on a weekly basis. Such work plan will describe locations of intended activities, types of activities, and potential conflicts to facility operations. Contractor shall perform Work in accordance with manufacturer’s instructions. Do no omit any preparatory step or installation procedure unless specifically modified or exempted by Contract Documents. Contractor shall maintain one set of complete instructions at the job site during installation and until completion. B. 1. 14 COMMISSIONING A. After all Work is completed, and prior to requesting the Acceptance Testing & Inspection, Contractor shall conduct a final inspection, and pre-test all equipment and system features. [. . . ] Group conduit in parallel runs where practical and use conduit rack constructed of steel channel with conduit straps or clamps. Use conduit bodies to make sharp changes in direction, as around beams. Fasten conduits and raceways to structural steel using approved spring clips or clamps. Where conduit penetrates fire-rated walls and floors, seal opening with UL listed fire rated sealer or other methods as approved by codes. [. . . ]